VolvoHordz;113279 wroteSo how far are you able to prep it in terms of getting everything cleaned up and patches cut to size?
I will need to engage in some cutting and grinding of the malignant panels, and then cutting out a suitable patch from the spare floor pan which I have here, to fit. Hopefully I can have it at the stage where you can walk in, set up, do your magics, and then collect and enjoy your beverages.
Whats your time frame for getting it done?
Depends on your timetable. Presuming all the metal is cut to shape and is ready to roar, what is a ballpark estimate of your time needed to work your magic?
S'pose we ought to talk dates, and what can work for you. What works for me is Sunday the 30th if you need one day, or the weekend after (which is August 5/6) if that swap meet in the Hunter isn't happening, if you need two.
Ideally I'd like to have it done sometime before the weekend of August 12/13 if humanly possible, so I can make some car room by gittin' that varmint outta here. If that's not possible, I'll have to bump a Canberra retrieval trip presently planned for that weekend, to the weekend of August 19/20.
Both don't look to bad to weld with at least some done from the above so I should be up for the task.
Gratitude! Please to advise of beverage type and quantity.